Auftraggeber:
|
TECHNODOMI ABETTE - MICH. TRAVLOS & BROS (O.S.E. - New Projects Direction)
|
 |
|
Projekt:
|
Railway line O.S.E. between Liosia Station and Thriasion Pedion
Sect. from km 19+111 to km 25+600
|
|
EXORIXI:
|
Blast design, blasting vibration monitoring and application of sequensial blasting technique
for the tunneling (9/94-3/97) [for the first time in Europe]
|
|
|
Auftraggeber:
|
ATTIKO METRO S.A.
|
 |
|
Projekt:
|
Construction of the METRO of Athens
Geophysical research between Syngrou Ave. - S. Analatou - S. Ag. Ioanni
|
|
EXORIXI:
|
Special blasting for the measurement program in the area of the tunnel (6/96)
|
|
|
Auftraggeber:
|
MECHANIKI S.A.
|
 |
|
Projekt:
|
Deviation of Kavala - Egnatia Road (by Palio Kavalas)
|
|
EXORIXI:
|
Blasting vibration monitoring of the tunnel (8/97)
|
|
|
Auftraggeber:
|
J/V TUNNEL PLATAMON - LEPTOKARYA - Section 1
|
 |
|
Projekt:
|
Construction - tunneling OSE by Platamon Castle
|
|
EXORIXI:
|
Blast design and blasting vibration monitoring during the tunneling
by using a net of 7 vibration monitors (1/98 - 4/99)
|
|
|
Auftraggeber:
|
TEB S.A. (J/V ATTIKI ROAD)
|
 |
|
Projekt:
|
Construction - tunneling MAVRI ORA (ATTIKI ROAD)
|
|
EXORIXI:
|
Blast design and blasting vibration monitoring during the tunneling and the surface excavations (5/98 - 2/2002)
|
|
|
Auftraggeber:
|
J/V AKTOR - ATTIKAT - TEB (J/V ATTIKI ROAD)
|
 |
|
Projekt:
|
Construction of the Western peripheral Ymittou Ave. (ATTIKI ROAD - A22, A21)
|
|
EXORIXI:
|
Design and blasting vibration monitoring of the tunnels by "Democritos" (6/98 - 10/00)
|
|
|
Auftraggeber:
|
J/V ABAX S.A. - KL. G. ROUTSIS S.A.
|
 |
|
Projekt:
|
Construction of the peripheral Avenue of Pireus
Sect. from Ag. Nicolaos anchorage to Ichthyoskala - Keratsini tunnels
|
|
EXORIXI:
|
Design and blasting vibration monitoring - tunnel blasting prescriptions under the DEH-Keratsini Buildings, near the mills of Ag. Georgios and a landmark. (11/98 - 5/99)
|
|
|
Auftraggeber:
|
ELLINIKI TECHNODOMIKI S.A.
|
 |
|
Projekt:
|
Bi-level house with cellar of the foundation "Goulandri", in Chora of Andros
|
|
EXORIXI:
|
Design and supervision during the access tunneling and the elevator shaft (3/99 - 12/99)
|
|
|
Auftraggeber:
|
J/V METON - AKTOR - TEB - SAGEK
|
 |
|
Projekt:
|
Construction of the traffic axis: Patra - Athens - Thessaloniki - Evzoni
Section: Railway Project by Kakia Skala
|
|
EXORIXI:
|
Study, blast design, surface-entrances and tunneling blasting vibration monitoring (11/99 - 2/02)
|
|
|
Auftraggeber:
|
J/V ATTIKI ROAD
|

|
|
Projekt:
|
E.L.E.S.S. & W.P.Y.R. - "ATTIKI ROAD" (WESTERN PERIPHERAL YMITTOS ROAD)
|
|
EXORIXI:
|
Design and tunneling blasting vibration monitoring near the "College"
under the byzantine church of Ag.Ioannis Kynegos (8/99 - 2/02)
|
|
|
Auftraggeber:
|
J/V OSE PROJECT - EVTAXIA TUNNEL
|
 |
|
Projekt:
|
New railway line Athens - Corinth, tunneling close to urban area
|
|
EXORIXI:
|
Design and tunneling blasting vibration monitoring under the national road, where a thin overhead (6 - 7/00)
|
|
|
Auftraggeber:
|
J/V TRITON - EDRASI
|
 |
|
Projekt:
|
Enhancement of the reservoir "N.Plastira" through deviation of the Kerasioti current
- Kryoneri tunneling
|
|
EXORIXI:
|
Blasting vibration monitoring during the tunneling of Kryoneri, under the settlement (9 - 11/00)
|
|
|
Auftraggeber:
|
TVX HELLAS S.A.
|
 |
|
Projekt:
|
Mine of "Mavres Petres" by Stratoniki, Chalkidiki
|
|
EXORIXI:
|
Study - design - blasting vibration monitoring of the mine
during its development - exploitation under the Stratoniki settlement (7/2001 - 6/2002)
|
|
|
Auftraggeber:
|
J/V IKONION TUNNEL
|
 |
|
Projekt:
|
Railway connection of the N.Ikonion port with the railway net
|
|
EXORIXI:
|
Study - design and blasting vibration control during the tunneling and the surface dikes
close to the coal-gas canal of DEPA and under the firing-pipe (2/2002 - in process)
|
|
|
Auftraggeber:
|
J/V PERISTERI METRO
|
 |
|
Projekt:
|
METRO - EXPANDING OF THE LINE 2 - TUNNEL SEPOLIA -THEVON
|
|
EXORIXI:
|
Study - design and blasting vibration control during the tunneling (2-7/02).
Test blasting in the area of the well-hole "Papandreou"
[The first tunnel blasting for the ATHENS METRO construction]
|
|
|
Auftraggeber:
|
J/V AKTOR S.A. - ETETh S.A. - THEMELI S.A. - THEMELIODOMI S.A.
|
 |
|
Projekt:
|
ANILIO TUNNEL & AG. NIKOLAOU TUNNEL (3.3) OF EGNATIA ROAD
|
|
EXORIXI:
|
Study - design and blasting vibration control during the Anilio tunneling
(a) Excavations for the entrance modulation (7-8/02)
(b) Blasting vibration control program during the approach of the fronts by the Anilio settlement,
using stationary vibration monitors net (9/2003 - in process)
|
|
|
Auftraggeber:
|
PANTECHNIKI S.A.
|
 |
|
Projekt:
|
CONSTRUCTION OF THE WESTERN PERIPHERAL AVENUE AEGALEO (W.P.A.A.) SOUTH JOINT - SKARAMANGA KNOT
|
|
EXORIXI:
|
Blasting vibration control (10/1999 - 11/2002) - close to military firing depots,
archeological founds (Iera Odos) and coal-gas canal DEPA
|
|
|
Auftraggeber:
|
"EDRASI - Ch. PSALIDAS" S.A.
|
 |
|
Projekt:
|
DRAINAGE TUNNELING OF VARI-KOROPI ROAD
|
|
EXORIXI:
|
Blast design and blasting vibration monitoring of the drainage tunneling on the Vari-Koropi Road (1-7/03)
|
|