Auftraggeber:
|
CONTROLLED DEMOLITION GROUP LTD
|
 |
|
Projekt:
|
Controlled Explosive Demolition, of two 20-story Buildings at the same time in Hackney London.
|
|
EXORIXI:
|
Participation in the Demolition Vibration Control Programme (19/3/1995)
|
|
|
Auftraggeber:
|
J/V BAKON (Red Cross)
|
 |
|
Projekt:
|
Controlled Explosive Demolition of the 17-stage Building of Red Cross in Athens.
|
|
EXORIXI:
|
Responsible Engineer of the Demolition Project, responsible of charging-ignition and
Blasting Vibration Control. (21/5/1995)
|
|
|
Auftraggeber:
|
CONTROLLED DEMOLITION GROUP LTD
|
 |
|
Projekt:
|
Controlled Explosive Demolition, of two 22-story Buildings at the same time in Kingshold Estate of London.
|
|
EXORIXI:
|
Participation in the Demolition Vibration Control Programme (23/7/1995)
|
|
|
Auftraggeber:
|
TECNIKI MACEDONIAS S.A.
|
 |
|
Projekt:
|
Sectional Demolition of the Railway Tunnel Cut & Cover, in Methoni Pierias
|
|
EXORIXI:
|
Study - Design - Supervision and Realization of the Tunnel Demolition (9/1999 - 2/2000)
|
|
|
Auftraggeber:
|
DEH - LIGNITE CENTER OF PTOLEMAIS - AMYNTAEON
|
 |
|
Projekt:
|
Controlled Explosive Demolition of the old Railway Bridge on the National Road Kozani - Ptolemais.
|
|
EXORIXI:
|
Study - Design - Supervision and Realization of the Bridge Demolition (7/5/2000)
|
|
|
Auftraggeber:
|
J/V MESAIKOS - TES - NESTOS (DEKE/YPEXODE)
|
 |
|
Projekt:
|
Demolition in a part of the Agios Pavlos Bridge, by the 35
th
Km. of the National Road Thessaloniki - N.Moudiana.
|
|
EXORIXI:
|
Study - Design - Supervision and Realization of the Bridge Demolition (29/6/2000)
|
|
|
Auftraggeber:
|
ERGOKAT S.A.
|
 |
|
Projekt:
|
Controlled Explosive Demolition of the Water Suply Tower in the Airport Area 110 PM Larissa
|
|
EXORIXI:
|
Study - Design - Supervision - Realization - Blasting Vibration Control and Demolition of the ca. 40 m. heigh Water Suply Tower, in the Military Airforce Area (27/4/2002)
|
|
|
Auftraggeber:
|
J/V ALPINE MAYREDER - ATTIKATT - EUCLEIDES
|
 |
|
Projekt:
|
EGNATIA ROAD - KARVALI SECTION - CHRYSOUPOLIS CROSSING
|
|
EXORIXI:
|
Sectional Demolition of the Draining Construction in the bed of Asprorema under the twin Bridge of Egnatia Road (5-28/6/2002)
|
|
|
Auftraggeber:
|
J/V GEKAT ATE - K.I.SARANTOPOULOS S.A. (EGNATIA ROAD S.A.)
|
 |
|
Projekt:
|
EGNATIA ROAD - VERTICAL AXLES OF EGNATIA ROAD BY THESSALONIKI PERIPHERAL (57.1-57.2)
UNEVEN KNOTS K5, K7, K9 & CONNECTION ROAD K4-K5
|
|
EXORIXI:
|
Demolition of the uneven knot of the Bridge made of fresh concrete, over the Katsimidi Road,
close to the knot K8 of the Thessaloniki peripheral Road Exit (13/8/02)
|
|
|
Auftraggeber:
|
EUCLEIDES S.A.
|
 |
|
Projekt:
|
INTEGRATION OF THE ROAD P.A.Th.E. - SECTION AG. THEODOROI - ALMYROS
|
|
EXORIXI:
|
Demolition of the old concrete construction of Sourpi Toll Station,
on the National Road Athens - Thessaloniki, by 271 + 800 (25/9/02)
|
|
|
Auftraggeber:
|
J/V SAGEK S.A. - EKTER S.A.
|
 |
|
Projekt:
|
EGNATIA ROAD - SECTION No 6 "KOULOURA - KLEIDI"
|
|
EXORIXI:
|
Controlled Explosive Demolition of the old Bridge Niseliou,
on the National Road Thessaloniki - Verria (8/7/2003)
|
|
|
Auftraggeber:
|
J/V RAHES - PELASGIA (EUROPEAN TECHNIKI S.A.)
|
 |
|
Projekt:
|
INTEGRATION OF THE ROAD P.A.Th.E., SECT. RAHES - AG.THEODOROI
|
|
EXORIXI:
|
Demolition of the old concrete costruction of the Pelasgia Toll Station,
on the National Road Athens - Thessaloniki (14/10/03)
|