Auftraggeber:
|
MYLONAS ATEBE
|
 |
|
Projekt:
|
Urgent Projects for overflow protection in the resion Rambetosa (Proj.Nr. 377)
|
|
EXORIXI:
|
Control - archive of the caused vibrations during the installation of "PASSALOSANIDES"
in the Region of the "Tymvos" of Marathon. (February 1999)
|
|
|
Auftraggeber:
|
J/V ATTIKAT S.A. - TECHNODOMI ABETE - MICH. TRAVLOS BROS - POLYTECHNIKI S.A.
|
 |
|
Projekt:
|
Construction of a new free avenue transposing the trolleybus lines from N.Faliro to Kondyli coast.
|
|
EXORIXI:
|
Vibration monitoring of the trolleybus traffic at the concrete area of the bridge A-D branch I
(12/99-2/2000)
|
|
|
Auftraggeber:
|
ABAX S.A.
|
 |
|
Projekt:
|
ATTIKO METRO: Extension of the line 3, Ethiki Amyna - Stavros
|
|
EXORIXI:
|
Noise monitoring and annoyance control due to worksite operation,
at the area Douk.Plakentias and Metamorphosis, Vrilissia (March - June 2002)
|
|
|
Auftraggeber:
|
CL. ROUTSIS S.A.
|
 |
|
Projekt:
|
Equestrian Center access (EE 13/01)
|
|
EXORIXI:
|
Vibration monitoring due to the worksite machinery at the byzantine monuments of the Pyrgos Dagla area, Markopoulo - Attiki (November - December 2002))
|
|
|
Auftraggeber:
|
G.M.M.A.E. LARKO
|
 |
|
Projekt:
|
Evaluation program of the exposured materials in the mines of AKRA Evia and AG.IOANNIS Fthiotida.
|
|
EXORIXI:
|
Sizing - fragmentation measurement based on computer photo-analysis of the exposured materials
(November - December 2002)
|
|
|
Auftraggeber:
|
J/V MELKA S.A. - CL. ROUTSIS S.A.
|
 |
|
Projekt:
|
Connection of Papandreou Avenue with the Pireus Port and accesses to the Port area (EE 4/02)
|
|
EXORIXI:
|
Vibration monitoring and bridge vibration control program (April 2003)
|
|
|
Auftraggeber:
|
EDRASI - CH.PSALIDAS S.A.
|
 |
|
Projekt:
|
New football Stadium "G.Karaiskakis"
|
|
EXORIXI:
|
Vibration monitoring control during the Installation of temporary casing bored piles
(May 2003)
|
|
|
Auftraggeber:
|
Pomonis Vassilios
|
 |
|
Projekt:
|
Study and Vibration monitoring in a house, caused from traffic in Hora - Andros
|
|
EXORIXI:
|
Control and evaluation of the vibration monitoring, caused from traffic
(August 2003)
|
|
|
Auftraggeber:
|
EMPEDOS S.A.
|
 |
|
Projekt:
|
EGNATIA ROAD - VERTICAL AXIS: THESSALONIKI PERIPHERAL ROAD -
UNDERPASS KNOTS K5, K7, K8, K9 AND CONNECTING ROAD K4 - K5 (57.1-57.2)
|
|
EXORIXI:
|
Control and noise monitoring of the worksite close to an aviary (November 2003)
|
|